Skip to Content
author's profile photo Former Member
Former Member

Planning version and planning run

Hi

Planning version 097 and 000 both is holding master data s like product location etc for a specific product ...but still production planning run for this specific product yields a result " object for this run doesnt exists in processing step 1"

Also i am able to perform foreground hiuristis run in rrp3 also..

what should be my next step ...should i investigate the SPRO and product master ?? please let me have your inputs

thanks

pv3.jpg (117.6 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Sep 02, 2013 at 05:49 AM

    Hi Rahul,

    Please go to /SAPAPO/MAT1 enter your product and location after that click on Choose planning version enter here 097 and check material exit in planning version 097. Also check material should be active in model 000.

    Also check in RRP3 are you able to run the product heuristic for version 097? Also to create a manual order in RRP3 in planning version 097.

    Also in CDPSB0 are you able to use function /SAPAPO/SAPLRRP_HEUR_MRP or Heuristic SAP_MRP_002 on other products?

    Also try to take planning run with Planning file entry.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.