Skip to Content
author's profile photo Former Member
Former Member

Org Structure replication from ECC to SRM

Hi,

We are using SRM7.02 ,

1. steps to perform org structure replicaiton from ECC to SRM ?

2. how and where to define number range for objects created in SRM i:e, BP,CP..... etc

3. what are the inputs necessary during replication using report : RHALENI ( tcode: PA30) for insert and update ?

4. how to sync the data from ECC to SRM and SRM to ECC, is 2 way possible ?

please throw some light on this

Regards

Kumar

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Sep 01, 2013 at 01:06 AM

    Hi Kumar,

    If you would like to replicate HR data to SRM, please do the neceaary settings according to note

    550055.

    It is not possible to replicate data from SRM to HR. This is not a two-way function.

    Best regards,

    Ivy

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 02, 2013 at 08:31 AM

    Hi,

    You should also refer SAP Note 312090 & following link:

    http://scn.sap.com/thread/3149748

    I hope it helps.

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.