cancel
Showing results for 
Search instead for 
Did you mean: 

Configuring transport routes

Former Member
0 Kudos

Hi Experts,

     I am looking for a way to transport from my DEV server to my RD server without disconnecting the DEV server and the PRD server. Is this even possible?

Refer to image below:

Any help would be much appreciated.

Thank you in advance.

Accepted Solutions (1)

Accepted Solutions (1)

AtulKumarJain
Active Contributor
0 Kudos

Answers (5)

Answers (5)

former_member182034
Active Contributor
0 Kudos

hi Rosendo,

You can configure STMS configuration with the help of step by step guide. Please find from following link.

STMS Configuration between Three System

Regards

former_member183107
Contributor
0 Kudos

Hi,

1. Goto Transport domain controller

2. Goto STMS->Edit->Transport target group->Create.

3. Give its name as /DevPrd/.

4. Create an entry in target system of PRD and PRD RD and their respective clients.

5. Now provide the entry of the above target group in deliver transport route.

Now the Tr released will automatically reach both the servers.

Problem solved.

For any queries please revert.

Regards,

Himanshu


Former Member
0 Kudos

This message was moderated.

Reagan
Product and Topic Expert
Product and Topic Expert
0 Kudos
former_member219338
Participant
0 Kudos

Create a transport group which includes the two systems and after transportation to the transport group the transport will be imported into both systems.