Hello

As per Rem scenario, I had process the following step

  1. Select Configured Material i.e FG, RAW
  2. Set BOM & Routing with Backflash work
    center, KP26,
  3. Run Ck11n – In this section System shown RAW
    material value & Activity value as correctly
  4. Ck40n – In this section system update material
    value only, ignore the activity value
  5. KKF6N – In this section System shown RAW
    material value & Activity value as
    correctly
  6. MFBF – The FG material value update only RAW material
    value.

I want to update the Activity value at FG Material – Pls advise
.. whether config error or others.

Regards

Avijit

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 29, 2013 at 07:15 AM

    Hello

    The same has been solved. The setting has been missing for Rate routing ID.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 28, 2013 at 01:17 PM

    Hi Avijit,

    There might be several or one reason for this, Check formula in OP54

    Few Checkpoints

    1-check operation overview whether activity is defined or not?

    2-Please check activity type master data and see whether you have selected "Actual price indicator"-- 5 or not?

    3-Assignements of Activity Types, Costing relevancy of the operation?

    4-Check the standard value key in work center & the formula assigned to it for that activity?

    I hope it helps

    Best regards

    Hrusikesh

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 28, 2013 at 02:01 PM

    Dear Avijit

    My first question is Why did you do CK11N and CK40N both for the same material? These two t codes normally gives you the same results. But as in your case there is a difference between the two so please check what routing you have used is CK11N and what is used in CK40N. There may be difference between the routings picked up for costing.

    At CK11N you have a liberty to u have a liberty to choose BOM/Routing or the production version whereas in case of CK40N first BOM and routing or Production version is picked up untill unless you define it in the material master.

    So first you check it and revert if it is not solved.

    Regards

    Rajneesh Saxena

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 29, 2013 at 07:20 AM

    Hello

    The same has been solved. The problem is coming from Wrong routing ID selection.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.