Skip to Content
author's profile photo Former Member
Former Member

Activity value not update by Ck24 or Ck40n

Dear All

As per Rem scenario, I had process the following step

  1. Select Configured Material i.e FG, RAW
  2. Set BOM & Routing with Backflash work center,
    KP26,
  3. Run Ck11n – In this section System shown RAW
    material value & Activity value as correctly
  4. Ck40n – In this section system update material
    value only, ignore the activity value
  5. KKF6N – In this section System shown RAW
    material value & Activity value as
    correctly
  6. MFBF – The FG material value update only RAW material
    value.

I want to update the Activity value at FG Material – Pls advise, where it is problem at Config part or other..

Regards

Avijit

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Sep 03, 2013 at 04:17 AM

    Hi Avijit,

    Kindly Check Log in Tcode : CK11N does any message is there like

    No structure could be determined for internal activity or any other error

    if your CK11N running successful then there may be some configuration

    issue kindly check Cost component structure also.

    thanks

    Trinath


    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.