Skip to Content
author's profile photo Former Member
Former Member

alternative items group in iPPE PVS

Hi gurus,

I have a question concerning alternative items group in iPPE product variant stricture.

I see this field, but how can I use it?

In classic BOM (CS02 t-code) togetrer with this field also exists a rules how to determine one of seferal alternative positions.

In PVS - no rules.

(see image attached)

How should I build iPPE-PVS if I have several alternative positions?

How this field (alternative items group) could help me?

Thank you!

Best regards,

Matvey

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 30, 2013 at 03:14 PM

    Alternative item groups in iPPE won't affect system behaviour, except for CO explosion procedures in method EXPL_HANDLE_APG of BADI IPPE_EXPL. As far as I understand the logic, non-stockable MPN material will be deleted from explosion results, if reference to stockable material is presented in material master for it.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.