Hi,

I configured the track sync in nwdi cms between N and N+1 tracks.

So that whenever the developer releases the activity for N track, that activity should be available

in Consolidation tab of N+1 track.

But this method is not working in NW 7.31.

Please suggest.

Thanks,

RY

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Ravi,

Please have a look through below link which might be helpful.

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b08abb67-0e34-2d10-78b8-e7246ad93...

Thanks & Regards

Amit

Former Member
0 Kudos

Thanks Amit. I already have this document. The NWDI system was all setup and running fine.

We are building track sync for already existing tracks to sync the code between N(prod landscape) systems and N+1 systems.