All,
<u>Business reason.</u>
There are some materials that we want to inspect before allowing an invoice for that material to be paid.
<u>Problem.</u>
Because we do not have the QM module turned on (or with to turn it on), the solution is to post all the material into a block status, i.e. material movment 103. The problem is that a few user forget to do the 103 and do a 101 from MIGO.
Is there any way so that the material movement 103 is defaulted into the MIGO screen by plant, either via customising or user-exit.