cancel
Showing results for 
Search instead for 
Did you mean: 

Purchase order

raju_123
Participant
0 Kudos

Hi Experts,

Please provide the user exit to calculate the difference between purchase order order qty and delivered qty after setting final delivered indicator in migo. appreciate if you can provide the tech details of the fields order qty, delivered qty, final delivery indicator. thank you.

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member183155
Active Contributor
0 Kudos

hi all ;

you can create a query report with tables EBAN - EKET - EKPO ,if you want for invntory try MARD

i give screenshot you , please try it.

but , take into account left outer join some tables.

regards

     M.Ozgur Unal

Former Member
0 Kudos
GRN DateMaterialMaterial Descr.PackBatchRcpt Qty in O.UoMStk PricePlantP.O.NumberVend. Batch No.Rate (NOM)  PO RateAddl. Excise DutyQC Rel. Qty in B.UoMB.UoMBasic Excise DutyR.R.NumberBill#O.UoMCityMvmt. TypeQC AR#Rcpt Qty in PiecesParty NameRcpt. Qty in B.UoMInsp. Lot#Pur GrpPO DateP.R.NumberMfr DateECS ValuePR DatePR DateExcise DateExp Date  MRPAct ShelfExcise NumberMaster ShelfManufacturer nameFrom Man. RR #Sampled OnDivIDDivision TextHeader TextMat. TypeDlr PriceGI Entry No.Rtl PriceSpl PriceInternal No.Tax CodeQC Rel Qty in PiecesGate Enry NumberGate NumberGate entry date NOM Value P.O.QtyPart-1(SNO)Part-2(SNO)     PR QtyPurchased valueQC Rel. DateQC Rel. Qty O.UoMQC Smp. Qty in B.UoMQC Smp. Qty O.UoMRcvd DateReceived BySchema GroupSent Date (RR)SHECSStatusTo Man. RR #Tracking No.Unloading PointVendor Code

Kindly use the above fields and  relevant tables to combine to get open purchase statement to get through Z-report

Note:

There is no user exit existing one more thing in ECC 6.0 version there is no User exit we need to call it as customer exit only .Kindly confirm with ABAP guy through BADI is it possible or not?

Former Member
0 Kudos

Develop a Z report using tables, EKBE,EKKO,EKPO.

EKBE for document flow that shows GR and IR respectively,

EKKO and EKPO for PO line details.

or you can use ME80FN standard report, but you need to sort it for your needs.

Cem

Former Member
0 Kudos

Hi,

Please use EKKO, EKPO, EKBE , MSEG as per requirement.

You have to club multiple GRN done as against 1 PO line item . Ths difference of EKPO-MENGE and  summation of GRN QTy will give you final result.

Also during this process please considered Reversal GRN documents.

Regards

Yasmeen