connect Solution Manager with SAP ECC 6.0 instance

Hello All,

Please guide with the required steps to connect a Solution Manager with the SAP ECC 6.0 instance.

Thanks in advnace.

Regards,

Amit Bharti.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    avatar image
    Former Member
    Jul 26, 2013 at 08:56 PM

    Hi Amit

    1.  Connect your ECC system into Central SLD.

         Logon to ECC system RZ70 -> Gateway Host(Fully qualified Domain name of solution manager)

         and Gateway Service - sapgw00 -> Press (F5) to start the SLD data collection.

         SLD will collect data and provide to LMDB and your system will be available in Solution manager

          -> LMDB -> Technical Systems

    2.  Create Product system in LMDB

         Go to LMDB -> Product System -> Select your Product System Name  -> Edit

         Go to left side “Navigation Tree” and select Technical Systems

      

         On the right side, Technical Systems -> Technical Systems of Product System -> Add

         In the pop-up screen, Search the Product Instance “Select By: Proposal"

         Then Go to the left side “Navigation Tree” and select Technical Systems ->

         SID (Application server Java)->Software

        

         On the right side,  Software -> Product Instances->Assigned Product Instances

         Put Tick mark” in the column “Installed” for the entire product Version displayed as SAP ECC 6.0

         Then SAVE these changes in LMDB.

        

         Now you can assign Logical component in SMSY for JAVA

    3.  SAP Host Agent installation – This is important if you configure Managed system configuration in Solution

         manager

         Regards, Praveen

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi P KK,

      There was a problem with RFC connection of the RFC destination "SAPSLDAPI" of the solution manager.

      After changing its below paramter. It worked fine.

      Gateway Host and Gateway Service.

      After that SLD was updated and followed the rest of the process mentioned by you and

      issue completed successfully.

      Thanks and Regards,

      Amit Bharti

  • Jul 26, 2013 at 08:23 AM

    Hi,

    There are many guides available here; pls go through them

    http://wiki.sdn.sap.com/wiki/display/SMSETUP/Home

    Regards

    Vivek

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 26, 2013 at 08:57 AM

    Hi Amit

    If you have just need to connect then

    • I am assuming you have connected the SLD to solman so that LMDB has the information with post setup completed including system preparation and basic setup
    • have generated the RFC destinations in SM59 via wizard

    If not you have follow these specific guide

    https://service.sap.com/%7Esapidb/011000358700000482292011E

    SAP has provided wizards in Solman_setup to perform all the post setup steps

    Regards

    Prakhar

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 01, 2013 at 10:30 AM

    Hi,

    I also had faced this error. please follow the SLD CONFIGURATION details mentioned in below document :

    http://scn.sap.com/docs/DOC-43932

    It will trigger SLD details to Solution manager system.

    Regards,

    Nilutpal.

    Add comment
    10|10000 characters needed characters exceeded