How to update cost center at the time creation of reservation in PM order

Former Member
0 Kudos

Dear Expert,

I have created PM order with type PM0 and take a material in componant tab of PM order. As soon as material no & G/L account is entered in PM order then reservation is created .

My requirement is how to update the cost center of reservation at the time of creation.

Plz suggest me either its possible standard process or customization is required.

if customization is required, plz suggest me any user exit, BADI.

Thanks in advance

Deepak

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member182535
Active Contributor
0 Kudos

Hi,

      For Reservation there is not required cost center and G/L account during material add in maintenance order because this is automatic determination cost from your material group and valuation type as assign to G/L account.

If cost is not determine in MO Please Maintain Value Categories and Assign Cost Elements to Value Categories.

rakesh_mane
Active Contributor
0 Kudos

Hello

As per STD SAP Cost Center get directly updated once Reservation created against work order.This automatic determination and updating cost center done by Material Group and and its Valuation type mapped to G/L account and each G/L agount have Set of cost centers.

BR

Rakesh

Former Member
0 Kudos

Reservation created from Order will not have Cost center as Account Assignment. It will have only PM Order. Only manual reservation with movement type 201 will have Cost center as reference.