on 01-12-2017 3:40 AM
I created the SO XXXXXXX LI10 which consisted of a VAS material under VAS ticketing. The VAS material perfectly got captured to the demand and showed the requirement in /n/afs/md04. We created a PO and did GRN for the VAS material. As the next step i created delivery (VAS details got captured to the delivery) but after PGI the FG quantity is reducing but the VAS stock is not reducing from the system. I want the VAS system to reduce (If each FG is assigned to one VAS material if the PGI is done for a quantity of 10(FG quantity) VAS stock also should reduce by 10). Please be kind enough to assist me
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.