Hi team,

I have created the production order in SAP. The Order status is "REL MANC PCNF PDLV SETC".

With the above status, i am setting the status "TECO" for my prod order. If i set the status 'TECO", what will happen for my component reservations?

After setting the TECO status, my prod order status will be "REL MANC PCNF PDLV  TECO SETC". With this status, can i able to settle & close my order?

Is the production order status should be DLV & CNF  for settlement & closure even though the order has TECO status?

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Jul 24, 2013 at 06:05 AM

    Hello Selva,

    With the above status, i am setting the status "TECO" for my prod order. If i set the status 'TECO", what will happen for my component reservations?

    Reservations/Capacity Requirements will be deleted and loose MRP relevance.

    With this status, can i able to settle & close my order?

    yes you can settle and close.But for CLSD,order balance must be 0 and if you dont have pdlv or dlv than how balance would be 0?

    Status CLSD:

    Prerequisite-

    1. Order in REL or TECO.
    2. ORDER BALANCE  0

    Result:

    1. no changes in order allowed
    2. no posting in order in any form

    Status TECO:

    Prerequisite-

    1. Status REL

    Result:

    1. Reservation deleted
    2. capacity requirement deleted.
    3. loose Mrp Relevance
    4. withdraw material and can confirm

    Regards,


    Message was edited by: dee joy

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 24, 2013 at 06:14 AM

    Hi Selva,

    I am just adding some point

    TECO:

    The following actions are executed if an order is set to Technically complete.

    • The order is not relevant for MRP planning
    • Reservations are deleted
    • Capacity requirements are deleted
    • Purchase requisitions for external operations or non-stock materials are deleted
    • The order and its operations receive the system status Technically Completed (TECO)

    After technical completion you can still make postings for the order. For instance, material withdrawal or a confirmation can be posted if they were previously forgotten.


    Add comment
    10|10000 characters needed characters exceeded

  • Jul 24, 2013 at 06:16 AM

    Hi,Selva:

    With the above status, i am setting the status "TECO" for my prod order. If i set the status 'TECO", what will happen for my component reservations?

    reservation will be cleaned..you won't see those component reservation in SAP

    After setting the TECO status, my prod order status will be "REL MANC PCNF PDLV  TECO SETC". With this status, can i able to settle & close my order?

    Yes..you can settle &close order in status of TECO or DLV &CNF ,

    Is the production order status should be DLV & CNF  for settlement & closure even though the order has TECO status?

    No.  TECO means no need to process the order (no production need to be carried out)

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 24, 2013 at 06:40 AM

    Dear,

    Once you set the TECO status to a production order system will activate the deletion flag to the reservation.

    Is the production order status should be DLV & CNF  for settlement & closure even though the order has TECO status?

    For settlement you should have status as TECO or DLV once the order get settled its balance become zero after that you can close the order.

    Hope clear to you.

    Regards,

    R.Brahmankar

    Add comment