Hi Guru,
I have a silly doubt:-
I have to create test data in lower system same as PRD 500.
In PRD one inspection lot is having UD ICCO STUP satus showing completed.
These are info in QA03(Insp Specification tab)-
Assigned specification
Group 305279,plant QM01(which in ref. plant)
Group counter 7
usage 6
Specification Slection
Material -XXXXX
But the moment I am checking Inspection plan in QP03 system its not showing as getting message inspection plan is not created.
Can anyone please explain me what is missing.How this inspection lot sample calculate with out Inspection plan and also UD is made.