on 07-17-2013 4:34 AM
Hi all,
kindly let me know is it possible to write DMR for the below case ?
i want to generate an inspection lot for every 6th partial GRN of a purchase order, means if a purchase order is having 6 partial GRN's system has to create 2 inspection lots ( for 1st GRN as well as for the 6th GRN)
regards
kirran
I think you can do this if you base the DMR on inspection task list/material and you have the inspection control set to each material document/material/batch/storage location.
But I haven't tested this myself to be sure.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Not possible through DMR.
you have to use some exit for lot creation.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.