Hi Gurus,
in our scenario we have set up the link between PP and WM using the PSA management.
The field "WM Request" is filled up with the X - "Only creation of transfer requirements on release" value.
In the case that the Production Order is structured as reported above...
Operation 0010:
- Component A
- Component B
Operation 0020:
- Component C
...the system generate 2 TR. The first one for the components A&B and the second one for the component C.
Which is the logic of TR grouping? 1 for each Operation of the Production Order?
Is possibile, by SAP standard, to change this grouping logics? Like 1 TR for each component mantained in the BOM?
Thanks in advance,
Marco