Skip to Content
0
Former Member
Jul 16, 2013 at 02:46 AM

Interesting Scenario

17 Views

Hi

I have interesting scenario.

Sales Order Changes are sent to a data base using Idoc via PI.

Idocs are serialized and QOS is EOIO.


1. Messages were successfully processed through the Integration engine.
The first message failed on the receiver JDBC Adapter as the key segments were not mapped correctly.
Rest of the messages were in hold status on the adapter engine, as the first message failed.

First message is cancelled now.

After the mapping is corrected, is there any way that it would be possible to

reprocess the messages (in hold status) to go through the mapping step..so that they can be inserted into DB successfully?