Additive for mixed costing

Hi Controlling Experts

Scenario: I have a material that is proudced in two different plants (A & B), and then they should be transferred (30%A & 70%B) to plant C (Distrubition plant).

Is it possile to get additive cost in Mixed costing?. I have created Procurement alternatives and Mixing ratios. also "Additive cost included" is selected in Costing Variant and additive cost check box was selected in Valuation Variant.

I have created additive cost with Category V (Variable item). But additive cost is not picking in standard cost estimate (CK11N)

I also tried to add via costing sheet, but costing sheet is is ignored when running CK11N.

It doesnt seem possible with SAP; However, in case it is not possible, what work around would you suggest

Regards

Ahmeda

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jul 16, 2013 at 05:05 AM

    Hi Ahmeda

    I never explored additive cost with mixed costing.. So I cant comment with confidence

    Did you create the proc alt in Plant C?? And are you able to see iin CK11N (Plant C), both the Proc Alt??

    Also, make sure that you are saving the additive cost in CK74N.. you need to save it after entering the values for Item Catg V.. And then, Press the back button and save it again

    If with all this, additive cost does not show up, then I think in mixed costing it wont be available... You can very well use the user exit option in Val variant (Strategy U)

    br, Ajay M

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Ahmeda,

      I have done this. And while doing CK11N or CK40N I don't have problem. I am getting additive cost while doing this.

      Problem arises when I use mixing ration. In CK94 I did mixing ration for the material in question and ran CK11N. After doing CK11N I am not able to see additive cost at all.

      Please let me know if you have any clue on this.

      Regards,

      Akash Patil

  • author's profile photo Former Member
    Former Member
    Posted on Jan 03, 2014 at 09:30 AM

    Hi Ahmeda

    Unfortunately as per SAP standard, this functionality is not supported

    Check SAP Note # 1573495 - Additive Costs do not appear in a Mixed Costing
    Scenario

    You may alternatively use Activities / Overheads tactfully to fulfill your requirement.

    Thanks & Regards

    Mustafa Sakerwala

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.