CharM 7.1 - How to replace existing system from landscape incase its required ??

Former Member
0 Kudos

Hi Experts ,

I have a question for you .

We are having healthy running CHaRM in Solman 7.1 SP7 with one of our client ,they are having a big setup and presently they are going for EHP6 upgrade .

So after two successful mock runs its time for the QA system to EHP6 Upgrade and in the meantime until upgrade&testing of  QA done , they want to replace the QA system in current ChaRM with some standby system .

I know its quit difficult either we can change the hostname of old QA or we can create a new project .......??

Kindly suggest what is the best possible way to do this ?

BR

Aashish Rai

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

You  can define a new logical component which  includes the standby system in the landscape chain  and replace the present logical component (with QA system) in the present project itself and activate the project IMG for the same and generate a new maintenance cycle for usage and once your system is  ready  you  could again  replace the old logical component  but there is a drawback that the CD's can get effected if open in the old maintenance cycle. Hence you could  complete them and perform the steps.

former_member188977
Contributor
0 Kudos

Hi, if you need deactivate QAS during Upgrade you can do it from LMDB seting it as "inactive".

But if you need to change some system or add a new Technical component you have to close the maintenance Cycle or create a new project.

Regards,

IV

Vivek_Hegde
Active Contributor
0 Kudos

Hi,

What you can do is;

1) Close current maintenance cycle along with all the CDs

2) Modify the landscape in solar_project_admin.

3) Generate a new maint. cycle.

Regards,

Vivek