Skip to Content
0
Jul 10, 2013 at 06:29 AM

Inspection plan does not exist in case of multiple specificaitons

100 Views

Hi Friends ,

I ahve created one inspection plan with multiple specifications everything is correct but lost is getting generated without plan . I have tried manually to assign IP but system says plan does not exist .

I have checked following :

Status : 4 Released general

Usage : 5 Goods receipt

IP lot size : 0 to 9999999 Pc

Valid from Date : 10.7.2013

Can any body please hehlp :

Mterial task list assignment contains 2 lines for the same material and two objects of object type "pharma"

Please help