Using the Maintenance Planner, I'm having a heck of a time getting a package built for RAR 1.2 that doesn't force me to install S/4HANA Finance. I have a valid prerequisite system (ECC 6.0 Ehp 8) but the MP will not allow me to deselect S/4. Don't want it. Don't need it.
Anyone else have this problem?