I have a case wherein equipment belongs to one plant; but when checked its inspection lot it has different plant & usage decision code.
Is this possible?
Inspection lot will be created against Planning plant as task lists & maintenance plan will be created on Planning plant.
UD code can be either Plant Specific or common across multiple plants. Generally, it will be common across plants. If you want to be specific, create selected set for each plant separately. It requires inspection type to be configured plant wise to assign appropriate UD selected set against that inspection type.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Are you refering to UD code selected set & its plant in Inspection lot.Then its possible because UD code of one plant can be used for other.
But if you are refering to plant in Inspection lot is not matching with the equipment master plant,then check the planning plant in IE02.Secondly check carefully the maintaiance plan & order from where this plant is appearing.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.