How to activate Issuing Plant in Component Overview of Task list ?

Former Member
0 Kudos

Hi SAP PM Experts,


How to activate issue plant in Component overview of task list. What is the use of field issuing plant(PSWRK) in component overiew of task list ? Can we create reservation of material for different plant by assinging issuing plant field value ?


Regards

Maheboob

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member203108
Active Contributor
0 Kudos

Please use for all PM related queries.

@ Maheswaran  - You are one of the top contributor of EAM/PM forum, you very well know that PM related queries are handled in that forum, whenever you see such PM related questions in this forum, either you suggest the OP to post in EAM forum or report to moderator to move it to appropriate forum, So that all PM related informations will be available at one space, it will help others to search and look solution at one place, not two different area.  This is for other contributors also.

Former Member
0 Kudos

Material XXXXXXXXX not maintained in plant 1001

Message no. CI067

Former Member
0 Kudos

Appreciate your thought.

I have insisted to open thread in appropriate space for many threads. But, sometimes it can't be avoided by having cross threads.

In PLM space, you can find threads related to PM, QM, etc., as well. So, its authors responsibility to find suitable space to open their thread.

former_member190819
Participant
0 Kudos

Hi Mehboob,

Pls Extend the material to desired plant whether you have stock in that plant or not.

Thanks

Former Member
0 Kudos

By default, Issuing Plant will be Maintenance Planning Plant. If you want to have different plant as issue plant, you can change the issue plant & reservation can be created.

Even in Task list, you can assign the material with different plant so that that particular component can be issued from that plant.

For example, Equipment is being located in Plant A. So equipment master, BoM & Task list will be created against Plant A. But one of the spares will be consumed from Plant B. In this case, that material would have been created for Plant B only in MM01 & it would not have been extended to Plant A. In that case, you can use that Plant B material for Plant A equipment.

Former Member
0 Kudos

Hi Maheswaran,

But in Component tab of General task list issuing plant is read only field but not an input field. Please can I how to activate from read only field to input field.

Former Member
0 Kudos

Plant will come from the Material which you selected.

In Material Selection, give plant from which you want to consume, so that based on the material selection, plant will get updated.

You can't edit the plant once after material selection in components overview.

Former Member
0 Kudos

Hi Maheswaran,

Let me make the requirment more clear,

1. General task list is created for Planning Plant : 1001

2. Material is maintained & stocked in Plant : 1004

Unable to assign the material of Plant 1004. Giving the Error Message "Material XXXXXXX is not maintained in Plant 1001.

I Can't extend this material to Plant 1001. Because stock is maintained in Plant 1004. There is not stock in Plant 1001

Requirement is to create Material reservation in Plant 1004 but not to Plant 1001

Former Member
0 Kudos

I created task list for first plant & assigned the material from 2nd plant. I haven't received any message for the above mentioned error.

Please post the error message number with diagnosis.

Martello
Discoverer
0 Kudos

Have you configured anything different as I am getting the same error message as