Skip to Content
0
Jun 17, 2013 at 05:54 AM

MRP Run based on material reservation and material type.

379 Views

Dear Experts,

I have a requirement to run MRP two ways.

MRP(Type 1) run for those materials, which need to maintain minimum stock. This is solved by changing MRP type to VB, and maintaining minimum stock level.

but the second requirement is, need to run MRP based on material reservation.

Requirement is, once the material reservation created from the maintenance order. When i run MRP ( Type 2), it should check all materials in the reservations, and available quantity in that plant. Basing on the requirement it should create PRs automatically.

I have followed through http://scn.sap.com/thread/1571481 . By Mr. Maheswaran. But could not follow the procedure. Can any one please explain.

Best regards,

Anil.