on 06-17-2013 6:54 AM
Dear Experts,
I have a requirement to run MRP two ways.
MRP(Type 1) run for those materials, which need to maintain minimum stock. This is solved by changing MRP type to VB, and maintaining minimum stock level.
but the second requirement is, need to run MRP based on material reservation.
Requirement is, once the material reservation created from the maintenance order. When i run MRP ( Type 2), it should check all materials in the reservations, and available quantity in that plant. Basing on the requirement it should create PRs automatically.
I have followed through http://scn.sap.com/thread/1571481 . By Mr. Maheswaran. But could not follow the procedure. Can any one please explain.
Best regards,
Anil.
Get the inputs from your PP / MM consultants on maintaining the MRP view data in Material Master, in MD02 & Configuration for MRP run.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Maheswaran and Ajit.
Thank you very much for reply.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you may maintain MRP type PD and lot size EX. if you are having safety stock requirement, you may also indicate the proportion of safety stock available for planning in config MRP > Planning > stocks>
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.