CSKB- Order BOM creation

Former Member
0 Kudos

Hi PP experts,

To create/save Order BOM in CSKB traxn, is it mandatory to choose 'Freeze BOM Single Level " or "Freeze BOM Multi level BOM"( Right click on Header). Save icon on menu is 'Grey' out.

Is there any way to save traxn without using above option.

Thanks in advance,

Jatin

Accepted Solutions (1)

Accepted Solutions (1)

former_member183783
Contributor
0 Kudos

yes.In order to change order bom,you have to freeze BOM first..or you can create a new order bom without freeze it..

if you want to save order bom without change and you are using VC,you can tick the option in configuration profile..

Former Member
0 Kudos

If you are not using VC, there is no Configuration Profile , hence Order BOM cannot be saved in background.

How can i create ORder BOM using CSKB( CS61 is only single level , hence CSKB for Multilevel)  without freezing?

More basic question , is there 'Freezed Order BOM "? , if so , which indicator in STPO table it represent?

Thank you much in advance,

Regards,

Jatin

former_member183783
Contributor
0 Kudos

When you fix a bill of material, the system creates an order-specific copy of the material BOM. In other words, it generates an order BOM from a material BOM. If you fix a BOM in the order browser, the system saves the data in the same way as for fixing a result-orientated order BOM in the variant configuration.

You fix

The system creates an order BOM that contains the following components:

A non-configurable material BOM

The same components as the material BOM

A configurable material BOM

    • All non-variable parts (components without object dependencies)
    • The variable parts (components with object dependencies), which the system selected as a result of the values assigned to the characteristics.

You can fix a bill of material on a single-level or on multiple levels. When you fix a bill of material on a single-level, the system creates just the one order BOM.

When you fix a bill of material on multiple-levels, the system generates order-specific copies for all subordinate material BOMs as well. The BOM, with which you trigger the multi-level fix, has to be a material BOM. The system creates order BOMs for all material BOMs of the subtree. If a subordinate assembly already has an order BOM the system leaves it as it is. If however, there are still material BOMs under such an order BOM, these are fixed.

I am not able to login SAP,so i cann't tell which field in SAP table..

CSKB is more for non VC material..

Former Member
0 Kudos

Hi,

is there a way in CSKB to save Order BOM without having to use option"'Freeze BOM Single Level"/ 'Freeze BOM MultilLevel.

if not, these options are just another name of "Save" functions.

Can anyone confirm this?

Thank you much in advance,

Regards

Jatin

former_member183783
Contributor
0 Kudos

When you fix a bill of material, the system creates an order-specific copy of the material BOM. In other words, it generates an order BOM from a material BOM. If you fix a BOM in the order browser, the system saves the data in the same way as forfixing a result-orientated order BOM in the variant configuration.

In other words,if you want to created a order bom,first step is to fix it.second:make change to the current bom..

If you didn't fix it,SAP won't allow you to make change to the BOM..