PPM/PDS not apearing in APO after cif

Dear Guru,

I have created few master data like material,location,resource,BOM (not a phantom one) ,Master recipe. I am able to cif all master to APO except master recipe.

All masters are are appearing in APO. I tried with both as PPM and PDS to cif, but i can not see it in APO.

I checked the Master recipe in ECC and itis showing no error. During CIF also there is no error appearing in both ECC(CFG1) and APO(SLG1), CQ monitor.

My Master recipe (MR) contains one operation and one phase.

I have done some general check:

1.Active integration model for product,location ,and Bom,recipe - all IM are active.

2.Validity of Recipe - up to year 2099

3.Machine time is maintained in recipe.

4. Control key in resource contains scheduling.

5.I have used only machine capacity i.e.008.

6.capacity formula and scheduling formula are both same.

7.BOM is active.

Note: My resource is a single mixed resource.

Guys, i am creating the Master recipe for the 1st time. Basically do not have enough idea on process industry.

Is there any configuration setting exist for PPM/PDS in APO or ECC system. which is missing in my case.

What are the other reason which can be in this case.

Thanx & regards

Kishor

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Jun 09, 2013 at 01:25 PM

    Hi Kishor,

    Check that your control keys have both scheduling and capacity requirements checked.  What are your scheduling and capacity formulas?   Check your resource formulas with the built-in calculator.

    How is your integration model set up for the PDS? 

    Best Regards,

    Mike

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Mike,

      1. The control key contains both scheduling and capacity requirement,

      2. The scheduling and capacity formula are the SAP standard formula ( SAP002 = Machine * Operation     quantity / Base

          Machine time = 100min

           Operation qnty = 1EA

           Base qnty = 1EA

      3. Resource capacity formula is same as scheduling.It is maintained as other formula in both case.

      4. PDS integration model contains product, location as filter.

      Please suggest in case any other issue is there.

      regards

      Kishor

  • avatar image
    Former Member
    Jul 09, 2013 at 06:54 PM

    Hi Kishor,

    I believe that the machine time should be maintained in H, in order to be visible in APO. I have experienced that if we maintain std value keys in min, it doesn't give results.

    Please correct me if i am wrong.

    thansk and regards,

    Shweta

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Try SAP006 on the Capacity Tab in "Processing formula" and SAP002 on the Scheduling tab in "Processing formula".  The machine time should be in the second standard value in the routing.

      Make sure you have created a production version in the MRP4 view of the material master or with TA C223.  Regenerate your IM and re-transfer.

      Thanks

      Prashanth

  • Jun 10, 2013 at 10:20 AM

    Hi Kishore,

    Pl check the resource consumption, if the consumption is less than 0.1 than the recipe will not be transferred to APO as PPM/PDS.

    BR
    Thamizh