Skip to Content
0
Jun 06, 2013 at 07:57 AM

Scheduled backup failing in DB2 for more than one instance through Semantec net backup.

27 Views

Hi Experts,

We are installed three instances in one server(ERP DEV, CRM DEV, BI DEV), It is created separate software and database for each instance.

It is taken as one default instance while SAP installation (CRM DEV) and now when we are scheduled the backup through Semantec Net backup tool it's happening backup for only Default instance (CRM DEV) only and it's failing for the remaining instances (ERP DEV, BI DEV).

Even if we need to take backup at database level we have to login as each SIDADM user, So is there any way to take backup for all these instances under single user which is Administrator.

Thanks,

Narasimhan Krishna