cancel
Showing results for 
Search instead for 
Did you mean: 

Cost Assignment defaults

Former Member
0 Kudos

Hi,

In info type 0015 assigned a wage type with some amount and also assigned a new cost cener by clicking the button cost assignment defaults to post the wage type amount to a different cost center .

But in posting, its picking all the amounts to one cost center which is assigned in IT 0001 even though a different cost center is assigned for wage type in IT 0015.

any inputs on the above issue??

Thanks.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Check the master cost center once in Infotype-27

Regards,

Vazid vali

Former Member
0 Kudos

Hi,

please check this post, this should containt all possible errors and answers.

http://scn.sap.com/message/14066694#14066694

Hope this helps,

tom

Former Member
0 Kudos

Thanks Tom..

Pointer are not reflecting in RT, changed PC 20 to 3 for those wage types..it works

Answers (0)