1. In the report S_ALR_87013558 the actual cost is not rolling up to higher levels.

4 Upon analysis I could see that in all hierarchy reports I find the same value $ 26,075 ( checked in the table RPSCO )

5. The actual cost of level 3 is 67,968 but the level 2 actual cost of its superior wbs 20,619. Why is the level 3 cost not added to level 2 in this case ?

Q) Why is the correction posting ( CORR ) and( KOAR ) has happened in level 3 and the cost not rolled up to level 2 wbs insted reduced with KOAR

Object Actual

PRJ 26,075
WBS Level 2 20,619
WBS Level 3 67,968

Could some please explian this scenario. Thanks