Skip to Content
0
Former Member
Jun 05, 2013 at 07:47 AM

Costing sheet for over head calculation

657 Views

Hi,

I have a order type zp01 and costing sheet xyz is already assigned to the order but my over heads are included in abc costing sheet. when i am creating an production order costing sheet is picking up default as xyz and when i am changing the order with the abc costing sheet over heads are calculated correctly.

Please help me in configuration where should i assign costing sheet to the order.

I have checked the valuation variants in OPL1 but the valuation variants is used by other order types/plants also.