on 06-04-2013 6:31 AM
Hi All,
We are following planning strategy "40" and sales scheduling agreement. When I try to do delivery against scheduling agreement's line item, system shows error with "only 0 EA material available”. We have 'n' number of JIT lines against material which is mentioned in scheduling agreement. For some of the schedule line I can able to delivery. When I check the "availability check" with "02" and checking rule as "A" as well "B" through CO09, system shows the stock value as well as confirmed qty against each and every line item which are not yet delivered. But, receipt qty is showing less than issue qty. I don't think so any missing configuration settings, because I can able to do delivery for some of the line item for the same material as well as other materials too. Why system not shows with qty while during delivery even though when we have enough stock in specified storage location. How to check whether stock in unrestricted area is already assigned with some other requirement? (We are following only scheduling agreement, not sales order). I have analyzed the stock through MMBE, I couldn't able to find any reservation as well as "schedule for delivery".
Thanks
Dear,
1. What is the Process you are following ?
2. Do you have any Batches ?
3. Share OVZ9 and MD04 and CO09 screen shots for better to assist you .
Thanks,
Naren
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
you have checked " Without RLT " .Have you maintained GR time ,In house Production Time and Goods Receipt Processing Time & Planned Delivery Time in MRP2 Tab and also Replenishment Lead Time in MRP3 Tab or not ?
Better to check below link of examples related to RLT .
http://wiki.sdn.sap.com/wiki/display/ERPLO/Available+to+Promise+(ATP)
Thanks,
Naren
Hi,
Thanks, We are using default standard configuration, not changed any settings in OVZ9. We are not maintained all those parameters which you mentioned here. My question is, the same setting is work for some of other materials which all are also not having maintained all those parameters. how?
What was the feasible option, whether we have to un check RLT indicator? if we un check RLT indicator, is it mandatory to maintain all those parameters in material master? Please clarify.
Thanks
Hi,
Thanks. We have use only the stock which is stored in "Un restricted" area. So, i think that the indicator "Incl. of restricted-use stock" is not an mandatory here.Where i have to check the item category ATP check on/off?
Bit confused that the same configuration setting was worked with some of the materials but not for other materials.
Thanks.