Send demand for plant and MRP area to SNC

Former Member
0 Kudos

Hi Experts,

We want to send demands out of ECC6.0 (no EHP yet) to SNC7.01 and we want to send separate data for plant and MRP area. I have assigned the Storage Location to an MRP Area. I was able to CIF the MRP Area to SNC and create a corresponding location in SNC of type 1007. So in SNC in order forecast monitor I can see plant and MRP area. In ECC when running RSMIPROACT at first for plant and then for the MRP area, I am getting the correct results BUT the PROACT idoc in Segment E1ADRM1/WE does only store the plant Information. As a result in SNC I can only see figures on plant Level and nothing for the MRP area. . I have checked the ABAP code that creates the IDOC data (FM SMI_MASTERIDOC_CREATE_PROACT) and it uses plant to fill E1ADRM1/WE segment. So, what is wrong here? Is it even possible to get seperate plant and MRP area data in SNC?                        
Thanks for some Input!
BR
Henning Pape

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

SAP has provided OSS note 1910315. Related BADI method has to be updated, see attachment.

BR

Henning