How to Configure GR capacity check, while creating PO ?

Former Member
0 Kudos

I am trying to configure " GR-capacity check " while creating PO.. I activated it in the IMG customizing, as a result, I can see the icon while creating PO,  but nothing happens as I click on it.

I defined Door and Staging area as well In IMG customizing before I activate the GR-Capacity check, and I activated it with relevance to DOOR, if that is relevant and/or helpful to understand my scenario better ..

Please help me config this setting as I have this demo due tomorrow  ..

Regards

Digant

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

GR capacity check will not work untill you maintain entries in WGRC1, WGRC2...

Step1: Maintain general entry for vendor in WGRC1 for without week number for a particular day -Save

Step2: create po and press enter ... it will give you a message (Storage location is must)

No time window assigned for plant XXXX and storage location XXXX

Message no. MEPO310

Check schedule line the time for the same is empty in delivery schedule tab

Step3: If you press GR capacity button , it will say no resources maintained, so you need to maitain resource for GR activity

Step 4: maintain some resources in WGRC2 for GR suppoting entry... maintain some number (not sure about correct input but random 1-4 digit number works)

Step 5: Create PO and press enterit will give you a message

No time window selected.

Step6:GR capacity check , it will provide you time window where resources are availble.. select the line and press "select TB profile " tab

Result: it will update delivery schudle with the time where resources are avaialble

Former Member
0 Kudos

I did exactly as said.. now i receive these error messages.

After assignment in WGRC2, as you said .. it still shows no time window assign for plant Z300 and sto.loc. 1

I did went out and retried to create PO. i thought i will help , but it didnt.

and also this other error come when i click GR capacity check icon.

" Error while calling SD_WHS_GET_UNIT_TYPE

     Message no. WGRC102 "

I have attached the screen Shots for further understanding..

Please guide me further.

Former Member
0 Kudos

the message is WGRC 102

Error while calling &1

some error while calling FM SD_WHS_GET_UNIT_TYPE... you need to get this debugged

seems not related to configuration you have done.

Former Member
0 Kudos

Dear,

I finished it . the error was due to data was not maintained in the transaction Code:S_ALR_87001689.

I was suppose to "Maintain Unit of Measure Load Category", I created a Z . medium load

then I assigned it to the PC (my unit of measure in PO).

This error can be solved using two steps:

1. Maintain unit of measure load category - Warehouse Management

   ( Txn code: not available. but click find in SPRO IMG and type load category , and click on the above exact line)

2. Assign UOM to UOM Load category.

  ( Txn Code: S_ALR_87001689.)

and then again try and create PO and click GR capacity Check Button and it runs.. Smoothly..;)

Thank you,



Answers (1)

Answers (1)

former_member210560
Active Contributor
0 Kudos

Dear Digant,

have you maintain via transaction WGRC1/WGRC2/WGRC3?

Regards,

ian Wong Loke Foong

Former Member
0 Kudos

No ,, i haven't .. i checked , it only show some table as i insert my data , table shows initial week and something..

I am new to this please tell me what to do. as soon as you can..

Also please tell me the prerequists of this funtion to work,..

And correct me if I am wrong , that if there are some raw material in the plant on the delivery day of PO, we are now creating,  then by using this function we can check that either we can post a PO by changing delivery date or Storage location...

Thank you

Digant

former_member193587
Active Participant
0 Kudos

hi

check whether u have mentioned the gros weight and net weight in the material master and  maintain the palletization data  in the ware house management view in the same material master.

Regards

Ragini

Former Member
0 Kudos

  I have maintained the following data.

Material: Iron Plates               Gross weight: 200 Kg

Net weight: 220 kg                 Palletization data: '5'      'PC'      'IP' (industrial pallet).

[1 PC = 200 kg]

now what else I have to maintain and where !

Please guide me further. !

Regards

Digant.

Former Member
0 Kudos

:

Please I am still waiting for the correct answer .. Please provide it as soon as possible...

Regards

Digant

JL23
Active Contributor
0 Kudos

I cannot comment on that function, we do not use it