Skip to Content

Batch selection

Hi expert,

Please find the attachment

When we are doing grs for subcontractor in this steps suppose we splitting the batches qty 1000 kg for 5 batches means 1 batch =200 quantity and in this batch we having a component like

Material1=200 qty

sub material1=66

sub material2=66

sub material3=66

Material2

sub material1=66

sub material2=66

sub material3=66

Etc.

Problem:

Batch calculation problem when we selecting second same split batch system not showing deducted quantity from previous balance but after posting it will shows deduct from previous balance. please see the screen shots.

Regards,

Ram

Material two.gif (107.4 kB)
Material one.gif (107.4 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 30, 2013 at 10:07 PM

    Dear Ram Rathode,

    your 2 attachments are actually the same screen shot. So it does not really help further.

    I have as well difficulties to understand your scenario

    What do you mean by material 1 and material 2 ? Are these the finished materials?

    What are the sub materials? do you mean components?

    Am I right assuming that you ordered 2 different finished materials in one purchase order from your subcontractor?

    and both finished materials have the same components?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.