hi,

for MM goods receipt, i able to see that the system refer to material ledger cost maintained in material master accounting view.

for SD vprs condition type, system does not refer to material ledger cost but base on exchange rate ob08.

may i know if material ledger is only applicable to MM component/raw materials but not applicable to SD finished goods?

thanks

regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on May 28, 2013 at 02:35 PM

    Hi SAM.

    Material Ledger is applicable for RAW, SEMI and Finished products.

    + When you do GR for a PurOrder the system post the provision BSX at the MM Material Master Cost and the difference in operation PRD.

    + When you do sales, the condition in SD is customized, so most of the time is picked from MM Material Master if you are in a MTS but you can customize your rules (also with abap code), a tipical example if you work with SD BOM that cost based on BOM explosion. The rules are also different if you work With MTO, subcontracting, and so on.

    The topic is huge, i recomend review with your SD consultant (or learn yourself SD LOL)

    An starting point is this OSS

    Note 547570 - FAQ: VPRS in pricing


    Also, check this note

    Note 1365939 - VPRS logic and Customizing settings in SD

    The note containt refference to lot of OSS that explain the VPRS behavior.

    Also check the currency translation problems in the following

    185225, 194817, 718890, 803066, 820676

    If you like to debug, check programs LV60AA19, LV60AA28, and LV60AA90

    Arturo.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 29, 2013 at 09:33 AM

    Hi,

    All material movements if the plant activated for Material Ledger the system generates ML Document.It is plant specific.

    Thanks.

    S.Sivakumar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.