Hi,
I am applying CM Patch 5 over CM patch 4 HF 8. After restarting J2EE I checked the error.log and config.0.trc and found that the update has been processed up to 30 out of 67. Actually the server has been restarted automatically after that update and as a result the patch application has not been successful. I refered to note 769859 and checked for the PingReplyTimeout and found the value to be 60000 as mentioned in the note. Even I tried to apply the patch by increasing the value but the result is same. I am running with SAP J2EE patch level 28.
Is there anybody who can help me out. I am in the process of upgrading EP to patch level 34.
Regards,
Sanujit