Hi Experts,
i have a situation here.
I have created a sales order with MTO item. This material has a RLT of 10 days maintained in MRP 1 view of the material master.
The problem is the system is letting me create the delivery even when i have not posted the sales order stock for this item if the confirmed delivery date lies BEFORE this RLT.
does the "CHECK WITHOUT RLT" Indicator in OVZ9 has something to do with this? it is CHECKED in my case.
if not then what are the other settings required to rectify this issue?
Thanks,
Siddhant