GL account for direct charge to WBS and Cost Center in PR and PO

Hi all,

G/L account no in purchase requisition/orderThis is my example situation. When I test creation of PR with account assignment P (project) or K (cost center) for either material (blank item category) or service (D item category), the PR item level account assignment will request for GL account. May I know where and how is it within OBYC to setup the automatic account determination for such case?

I have been reading this thread -> http://scn.sap.com/thread/1109076 but still unable to get it to work, meaning the PR screen is still not proposing the GL after maintaining the required fields, i.e. material # and quantity or service #, material/service group and plant.

I would be grateful if anyone can point me to a thread that already has this answered.

Thanks in advance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 23, 2013 at 05:01 AM

    Hi,

    Refer threads which already discussed to have default G/L account in purchase order for material master and for service

    http://scn.sap.com/message/10751426

    http://scn.sap.com/thread/2094924

    Regards,

    Biju K

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.