Make to stock with CIR

Hi expert,

I have a question for you all. We used to work with Make To Order logic for our production therefore we used to have a SO which was creating word orders and so on... We now need to move into a Make to stock logic as we are externalizing our production to a vendor. This means that we need to place a PO with this vendor and we also need to make it without any SO reference just because we still don't have it but we need to keep our vendor making stock for us. I don't really know how to make it. I need to produce a sort of dummy SO which could be a CIR? I understand the CIR logic cannot be used for Make to Stock order? Is that right? What happen if I use the PIR logic for this purpose? Is it going to work?

Many Thanks for your help.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 24, 2013 at 05:00 PM

    Leonido,

    You placed this question in an APO forum, but you have asked questions that imply that your planning is done in ECC. Please confirm if you are planning in APO or in ECC.

    We now need to move into a Make to stock logic as we are externalizing our production to a vendor

    This is not a SAP technical requirement, I will assume you have additional business requirements that cause you to change to MTS. MTO is compatible with Purchasing. The most common reason to use MTS is that you wish to build Finished goods stock before the Sales Orders arrive, to give you better compliance to customer's request dates. In MTS you generally create Planned Independent Requirements, run MRP, and release the resulting procurement proposals to get your your vendors building stock for you.

    In general, the most common method to change from MTO to MTS for a sellable material (FERT or HAWA) is to change the Planning strategy in the Material Master from an MTO strategy to an MTS strategy.

    Naturally, you will have to come up with a transition plan. What do you do with your existing MTO production orders, what do you do with your existing MTO stock, what do you do with your MTO Sales orders. You normally decide upon your cutover strategy, then practice it several times in your Quality system, before going live in Production.

    Best Regards,

    DB49

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Leonildo,

      For a purchased MTS part, you normally do not send a BOM to the vendor with the purchase order as part of the planning process. The specifications for manufacturing are handled outside the planning system; your specifications department sends appropriate technical documents to the vendor which give him manufacturing details of the material that you wish to purchase from him. These documents may accompany the purchase order, or they may be sent in anticipation of the purchase order, and the vendor is instructed to keep them on file.

      You did not mention whether you also intend to supply component materials to the vendor, nor whether you wish to plan these components on your local system. For this, you normally use a subcontracting scenario.

      http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b900743ad11d189410000e829fbbd/frameset.htm

      Best Regards,

      DB49

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.