Skip to Content
author's profile photo Former Member
Former Member

BPF Process Instance Issue in Step "Check Assignments"

Hi everybody.

I’m having an issue in SAP BPC 10 NW when trying to create a “Process Instance” within Business Process Flows in the Step 4 “Check Assignments”.

The message I’m getting says “Due to the large number of instances it is not possible to change the assignments in this step” I really need to see all the activity instances just to make some changes In “Change Performer” and “Change reviewer” for an specific purpose in my BPF. I´m supposing this is happening because the system is generating more than 100 activity instances as showed in the screen below:

Do you know if there is some way to get this information in step 4?

Thanks in advance

WS_Step4.PNG (12.8 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on May 21, 2013 at 08:05 AM

    Hi Miguel,

    What BPC version are you using? If it is below SP 06 then please upgrade to SP06 or latest available SP.

    Explained in the following SAP Note -

    Note 1674621 - Change BPF process instance assignment limit from 10 to 100

    Hope the info is useful to you.

    - Ashwin.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.