Exclude prod Sloc from MRP, still consume stock during MFBF

Hello Experts,

We have 2 Storage Locations REC1 and PRD1, currently MRP is running considering stock in both the storage locations.

The Logistics requirement is:

1. PRD1 storage location is to be excluded from MRP and stock from PRD1 Storage location should not be considered when running the MRP.

2. Consumption of the stock should only happen from PRD1 storage location (backflush should happen in PRD1 Sloc.)

For example:

Total Stock Plant: 1000 pcs

PRD1: 300 pcs

REC1:700 pcs

When we run MRP the planning has to be carried only considering 700 pcs in stock and schedule lines should be generated.

When declaring Production (T.Code: MFBF) the stock should be consumed out of 300 pcs.

Is there any possibility to avoid the stock only (But need to consider demand / requirements) at PRD1 storage location while performing MRP at plant level?

Have anyone customized a solution like this before?

Thanks for your Assistance.

Ayub

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Posted on May 20, 2013 at 06:43 AM

    Hi

    For excluding the SLoc stock from MRP run , you need to select the MRP indicator 1 in T code OMIR in combination to Plant and Sloc.Then you need to select againg MRP indicator 1 in MMSC for material and Plant combination.

    Also it doesnt mean that while doing MFBF system will not allow to do GI from exculded storage location.You need to use BAdi RM_BFLUSH_GOODSMVT for your requirement.

    Check and revert

    Regards

    Anupam Sharma

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Subrahmanyam,

      Making those setting will propose the sloc as default while doing MFBF but, the same can be changed at the time og MFBF choosing from drop down as material is already extended to that sloc and backflush can be done.In order to restrict the user to do GI from one sloc, you need to implement BAdi.

      Regards

      Anupam Sharma

  • author's profile photo Former Member
    Former Member
    Posted on May 20, 2013 at 09:28 AM

    Hi Ayub,

    Removing the storage location PRD1 from MRP may cause inconsistency in planning as the reservations created for your production orders will trigger extra (false) requirements. If you can brief your requirement further on my you want to exclude the PRD1 location will help to suggest a better option.

    Srinath R

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 21, 2013 at 07:16 AM

    Dear,

    Please refer the link,it will help you to get the solution:

    http://scn.sap.com/thread/3223869

    http://scn.sap.com/thread/2008822

    If not,pls let me know.

    Thanks,

    Mohit

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.